% % stack: area-vec pep % @@ % % running the Tree system for this task level % initiate the form, the Dpanel will load and notify % about startup % % push current, start new task level % *taskprep % % stack: prior-owner % % float the opened task tree above the prior task % Mep._ App.Above % % the Dpanel will be ready downstream %